The Palm Tower, a new landmark from master developer Nakheel, under construction at the heart of Dubai‘s iconic Palm Jumeirah, features Pilkington‘s Suncool™ One 30/21 solar control glass.
The hotel promises each of its luxury hotel rooms and apartments will feature one of the best views in the city; to achieve this, the 52-storey, 240-metre-tall hotel and residential building will be clad entirely in glass.
Of course, Dubai’s climate means preventing excessive heat build-up inside heavily glazed buildings will always be a priority.
The project saw the architect install 50,000 square metres of Suncool™ One 30/21 solar control glass so that residents and guests enjoy both stunning vistas in cool, comfortable surroundings.
The glass features a state-of-the-art multi-layer coating, incorporating a microscopically thin layer of silver to help reduce heat transmission to just 21%, while maintaining a neutral colour balance in the light passing through, maximising the views.
The building is clad in an area of glass equivalent to 192 tennis courts, but because of the advanced magnetron sputtering technique used to apply the coating, just eight kilogrammes of silver was needed to cover the whole tower. That’s a piece of silver approximately the size of a laptop.
Pilkington Suncool™ One 30/21 was originally developed by Pilkington United Kingdom Limited, part of the NSG Group, for Intraco UAE, which has used the glass on a number of projects in the past.
Leo Pyrah, product manager at Pilkington, commented: “The view you will get from these hotel rooms and apartments is one of the major draws of this building, but clearly a fully glazed skyscraper in such a hot climate creates challenges from an energy management perspective.
“The bespoke coating we have developed alongside Intraco lets the developer and its customers enjoy the best of both worlds – a stunning view with much reduced solar heating.”
As the centrepiece of the world-famous Palm Jumeirah, The Palm Tower is set to become a new landmark for Dubai.
When completed, the mixed-use complex will feature 432 apartments and 290 hotel rooms, as well as a rooftop dining and recreation destination featuring a 360-degree roof top infinity pool, a high-end restaurant and a public viewing deck offering sweeping views of The Palm, the Arabian Gulf and the Dubai skyline.
As well as creating a comfortable climate for users, the solar–control glazing will also significantly reduce the need for air conditioning, reducing costs and emissions.
Leo Pyrah added: “Dubai is a city that is pushing architectural and technological boundaries and we’re excited to have played a role in shaping the look of its iconic and ever-evolving skyline.”
Contact:
Pilkington United Kingdom Limited,
Greengate Works,
Sherdley Road,
St. Helens,
Merseyside,
United Kingdom,
WA9 5 DZ
Phone: 01744 692000
Fax: 01744 692569
Visit Pilkington Building Products' website
English Spirit Distillery has used an extensive package of Altro products front and back of house, in their new visitor centre café, shop and viewing area for the working distillery.
Posted in Articles, Bathrooms, Bedrooms & Washrooms, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Floors, Interior Design & Construction, Interiors, Kitchens, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products, WallsAbloy UK has supplied The Safety Letterbox Company Ltd with a bespoke Sentry CL811 Camlock for use in its Secure Information Boxes, assisting life safety and complying with new regulations and legislation for high rise buildings.
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Facility Management & Building Services, Health & Safety, Posts, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire ProtectionSituated at the northern edge of a newly developed retail park near Bristol, the Abbey Wood Travelodge was conceived as part of the company’s new Budget-Luxe line of hotels – it features CUPACLAD, from CUPA PIZARRAS.
Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Cladding, Concrete, Cement, Admixtures, Facades, Posts, Restoration & Refurbishment, Retrofit & Renovation, WallsOrigin’s latest investment is set to redefine industry standards as it launches its own in-house powder coating facility.
Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Doors, Glass, Glazing, Innovations & New Products, Paints, Coatings & Finishes, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Windows