Plasterboard wastage rate cut in school build project

  • 7 Apr 2015

St. Cuthbert’s Business & Enterprise College was designed and built as part of the Building Schools for the Future (BSF) programme.

The project’s drylining package was awarded to Sound Interiors; determined to minimise waste, the company enlisted the help of Knauf’s technical services.

Knauf assisted with amending the school’s initial design to reduce the number of board types to 7 from over 10.

This allowed for greater flexibility in re-using offcuts.

The workers were also discouraged from using full boards, as they were paid an extra 20% for every square metre they installed using offcuts as a substitute.

Storing offcuts

To reduce waste further, the decision was made to store the offcuts inside the building within ‘quarantine’ areas.

The ‘quarantine’ or ‘recycling station’ spaces were secured by barriers to prevent general access. Sound Interiors agreed to take responsibility for the waste, which would not usually be allowed to be stored on site.

Offcuts that measured over 300mm were recorded before they were put into the storage area. This method enabled the project’s operatives to select suitable offcuts for use.

Wastage rate cut to 9%

Upon the project’s completion, the resulting wastage rate for plasterboard was 9%; this is below the industry average of between 15% and 25%.

By saving and re-using offcuts, the team improved efficiencies in site works and reduced the number of deliveries and resources required to manufacture the products.

The implemented waste saving measures also saved Sound Interiors over £2,000 in the cost of skip hire, as around five skips of plasterboard waste was saved.

Leave a Reply

Latest news

AWMS
LIFTEX

Registration opens for LIFTEX 2025 (11 - 12 June)

Registration has opened for LIFTEX 2025. Now in its 37th year, the show is the UK’s only dedicated exhibition for the lift, escalator and access industry and takes place only once every three years.

Posted in Accessibility, Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Exhibitions and Conferences, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation

Tobermore
Tobermore

Groundworkers - improve your tender success rates with Tobermore's Secura Portal

For groundworkers, tendering residential retaining wall projects can be a time-consuming and complicated process. The key is to tender using Tobermore’s Secura modular concrete block retaining walls rather than the default masonry specification & the Secura Portal, an online tool.

Posted in Articles, Bricks & Blocks, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Civil Engineering, Concrete, Cement, Admixtures, Facility Management & Building Services, Hard Landscaping & Walkways, Information Technology, Innovations & New Products, Landscaping, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls