Plumbing work carried out at 18th century house to replace damaged systems

  • 28 Mar 2014

Together the range is designed to provide a fire resistant and sustainable solution with pressing systems, meaning there is no requirement for hot works to be used at Mount Stewart.

Geberit House
Edgehill Drive
Warwick
Warwickshire
CV34 6NH

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows