REHAU underfloor heating for new super school

  • 27 Mar 2017

Video of the Week features REHAU underfloor heating  installed in Llandysul School, the largest school ever built by Ceredigion Council in South Wales.

REHAU Llandysul School Case Study

Llandysul School, a new energy efficient £30m super school in Wales, features more than 11,000m² of REHAU pipework – 9,200m² fitted using REHAU’s Tacker sheet system and 2,000m² fitted using its diffusion plate system over a timber suspended floor.

Underfloor heating VIDEO

REHAU underfloor heating 

The quality of REHAU’s PE-Xa pipework impressed main contractors Willmott Dixon Construction along with the speed of installation carried out by specialist sub-contractors Amroc Heating Services.

The underfloor heating is integrated into a full BMS intelligent control system. A built in MODBus® communication network enables easy connection into most Building Management Systems.

The Tacker sheet system, which provides a fast and efficient way of fixing the underfloor heating pipework directly onto insulated sheets, has been used for all of the main parts of the building, while REHAU’s diffusion plates have been used for the sprung floor in the sports hall and dance studio.

The sophisticated control system offers a wireless option and a cooling function to optimise individual comfort.

Architects: Powell Dobson

Consultants: AECOM

Main contractors:  Willmott Dixon Construction

M&E contractors:  Hurleys

Specialist sub-contractors:  Amroc Heating Services

About Llandysul School

Llandysul is a new super school that merges five schools – Ysgol Dyffryn Teifi, Aberbanc, Coedybryn, Llandysul, and Pontsian.

The build involved the construction of a new two-storey 11,200m2 facility to accommodate 1,000 primary and secondary school pupils.

The school facilities include a large hall, sports hall, kitchen and catering facilities, and 47 classrooms including science laboratories and IT facilities.

The design of the school incorporated many sustainable features, including photovoltaic panels, and will make use of natural light and ventilation, to help create an energy self-sufficient school.

External landscaping of the surrounding area includes four sports pitches, a full sized 2G synthetic sports pitch and on-site parking.

Contact:

REHAU
Hill Court,
Walford,
Ross on Wye,
Herefordshire,
HR9 5QN

Email address: [email protected]
Tel: 01989 72600

Visit REHAU's website

Leave a Reply

Latest news

ASSA ABLOY

ASSA ABLOY EMEIA: Save valuable time and money with a seamless switch to programmable digital keys

In 2025, access management can be a whole lot easier. By making access part of their digital processes, businesses can put time-consuming key management and the cost of changing the locks firmly behind them. Making this switch is a lot easier than many people think, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, Health & Safety, Information Technology, Innovations & New Products, Retrofit & Renovation, Security and Fire Protection

Showersave
GEZE
Insight Data

Insight Data achieves ISO9001 recertification with zero non-conformities

Leading industry data specialist, Insight Data, has successfully achieved the prestigious recertification for ISO9001 with zero non-conformities for the fourth consecutive year.

Posted in Articles, Building Industry News, Building Regulations & Accreditations, Building Services, Information Technology, Research & Materials Testing