Schlüter-Systems Ltd has launched a brand-new RIBA Approved CPD, which offers an overview of the factors to bear in mind when specifying tile and stone.
The new CPD has been developed based on feedback from Schlüter’s specification experts as to the needs of their architects in the field. The ‘Considerations for Tile and Stone Installations’ CPD delivers key insight for those who are new to working with these popular materials, or who would like to update their knowledge base.
– The differences involved in specifying for wet vs. dry areas and walls vs. floors
– Classifications and ratings for tile and stone coverings, substrate preparation etc
– Why and how to specify tile fixing in conformance with British Standards
– How to prevent problems by specifying the correct support beneath the surface
– What to consider in setting an appropriate cleaning and maintenance schedule
With tile and stone being used across many areas – from bathrooms and kitchens, to foyers, balconies and more – the information shared in the new CPD forms the foundation of a valuable bank of knowledge for architects and specifiers. In-line with RIBA requirements, running time for the CPD is just 45 – 60 minutes, and the seminar is delivered at architects’ and specifiers’ offices at their offices and convenience.
– Specifying Integrated Wetroom and Waterproofing Systems
– Specifying Integrated Underfloor Heating Systems
– Specifying Solutions for Crack-Free Tile and Stone Coverings
– Specifying External Applications with Tile and Stone
Visit the website for more information about ‘Considerations for Tile and Stone Installations’ or any of Schlüter’s other CPD seminars.
Schluter-Systems
Units 3-5 Bardon 22
Beveridge Lane
Coalville
Leicestershire
LE67 1TE
UK
01530 813396
Visit the Schluter-Systems website
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows