Schöck Isokorb prevents thermal bridging at new Irish distillery

  • 17 Apr 2015

CASE STUDY: Schöck prevents thermal bridging at Irish distillery development

The new Still House (Courtesy of Wain Morehead Architects)

Irish Distillers Pernod Ricard

€100 million is being invested in new plant to double the capacity at Irish Distillers Pernod Ricard development of its main distillery in Midleton, County Cork.

When complete, Midleton will be one of the most modern distilleries in the world, boasting three 75,000 litre pot stills, and three column stills, which are used in combinations of three to produce the different types of whiskey.

Sustainability has always played a significant part in Irish Distillers Pernod Ricard’s development programmes and the current expansion is no exception.

Tommy Keane, head of distilling operations at Irish Distillers: “Sustainability was a pre-requisite from the outset, from the design stage. Every element was examined from a sustainability perspective”.

Architect John Morehead, of Wain Morehead Architects:“We were able to incorporate all the tools and techniques we used from doing passivhaus buildings and apply it to this building”.

Prevention of thermal bridging

Schöck prevents thermal bridging – KST modules in position

The 21.5m high pot still hall building envelope is designed to a very high level of thermal performance and one of the design factors that had to be taken

into account was the prevention of thermal bridging.  There is of course a regulatory need to reduce local heat loss and CO2 emissions. But in addition, condensation can be a potential problem too, frequently resulting in structural integrity problems – and even mould growth, which brings its own set of health risks to personnel.  

The pot still hall has an overhanging roof element and this is insulated to the top, leading edge and underside on the north elevation and part return on the east and west elevations over a glazed wall.   To prevent any risk of thermal bridging at these roof overhang connectivity points, the structural elements to the primary steel are isolated from the interior environment using Isokorb structural thermal break units from Schöck.     

The Isokorb is one of the most sophisticated solutions on the market, for the prevention of thermal bridging in connective situations; and has been supplied for the project by Contech Accessories, of Tullow, County Carlow, the Schöck sales partner and sole distributor for Ireland.

Isokorb outstanding thermal efficiency

The Isokorb offers outstanding thermal efficiency and unrivalled application options, allowing connections to be made between concrete-to-concrete, concrete-to-steel and steel-to-steel. One of the modular connection types even allows the retro-fitting of balconies in certain situations.  At Midleton, it is the KST-QST module for steel-to-steel applications that has been specified.  The KST modules are unique in being able to withstand extremely demanding loads and incorporate stainless steel components to ensure corrosion protection and minimise thermal conductivity. 

Due to their thermal insulation properties, the Isokorb modules dramatically reduce energy loss in connective areas by guaranteeing that there is uniformity between cantilever structures and the internal structure at the thermal envelope. They also transfer load and maintain full structural integrity, while at the same time enabling inner surface area temperatures to remain well in excess of those likely to cause mould formation and condensation. The units are easy to fit with regular end-plate connections and all available steel profiles can be bolted on.

Schöck Isokorb range compliance and certification

  • entire Schöck Isokorb range provides BBA Certification and LABC Registration
  • exceeds the requirements of BRE IP1/06 and Part L of the UK and Irish Building Regulations – these state that the temperature factor used to indicate condensation risk (fRSI), must be greater than, or equal to, 0.50 for commercial buildings, a requirement comfortably exceeded by incorporating the Isokorb into the design
  • compliance with the Government Standard Assessment Procedure, SAP 2012, concerning CO2 emissions from buildings, and respectively heat losses through non-repeating thermal bridges
  • lambda values of the Schöck Isokorb enables energy loss through balconies, canopies and other cantilever parts of the building to be reduced by as much as 84% to 91%.

Schock
The Clock Tower
2-4 High Street
Kidlington
OX5 2DH
UK
 
Phone
0845 241 3390
 
Fax
0845 241 3391

Visit Schock's website

Leave a Reply

Latest news

Altro

Altro distils style and performance at English Spirit

English Spirit Distillery has used an extensive package of Altro products front and back of house, in their new visitor centre café, shop and viewing area for the working distillery.

Posted in Articles, Bathrooms, Bedrooms & Washrooms, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Floors, Interior Design & Construction, Interiors, Kitchens, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products, Walls

Abloy

Abloy UK creates bespoke locking solution for Secure Information Boxes

Abloy UK has supplied The Safety Letterbox Company Ltd with a bespoke Sentry CL811 Camlock for use in its Secure Information Boxes, assisting life safety and complying with new regulations and legislation for high rise buildings.

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Facility Management & Building Services, Health & Safety, Posts, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection

CUPA

CUPA: CUPACLAD enhances hotel aesthetics with a creative natural slate façade

Situated at the northern edge of a newly developed retail park near Bristol, the Abbey Wood Travelodge was conceived as part of the company’s new Budget-Luxe line of hotels – it features CUPACLAD, from CUPA PIZARRAS.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Cladding, Concrete, Cement, Admixtures, Facades, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls

Origin