Stannah: BREEAM for Lifts, Escalators & Moving Walkways

  • 15 Jul 2022

BREEAM NC 2018 and Refurb & Fit-out 2014 is the best way to ensure sustainable value and efficiency in your project; within these, you can get BREEAM credits for lifts, escalators and moving walkways which can help the building achieve the best rating possible. Stannah has more…

BREEAM 2018 (Building Research Establishment’s Environmental Assessment Method)

The BREEAM rating system awards BREEAM points for passenger lifts, moving walkways and escalators in newly constructed buildings. Or refurbishment and fit-out where there are new or replacement lift systems (for lifts, this would include undergoing major works to existing lifts such as moderations to the lift capacity). Vertical transportation falls under the energy section, with the aim set BREEAM requirements for lifts, escalators and moving walkways.

What transportation systems are covered by BREEAM Lifts?

Lifting platforms, wheelchair platform stairlifts or other similar facilities to aid persons with impaired mobility are not included in the criteria.

Any lifting device with a rated speed greater than 0.15m/s must be assessed, including goods, vehicle and passenger lifts.

Evacuation lifts, used during an emergency only, can be excluded from the relevant BREEAM criteria. However, if these lifts are used during the normal operation of the building, they still need to be assessed.

Ene 06 Energy efficient transportation – credit requirements

It is possible to contribute up to three BREEAM points for lifts, escalators and moving walkways by complying with the criteria stated in Ene 06.

What maximum points can I get for my BREEAM project from my vertical transportation?

Where only lifts, escalators or moving walks are present, a maximum of two credits is possible. Three credits are available where both lifts and escalators/moving walks are present.

Are you looking for technical information or Energy Analysis?

We can provide energy consumption figures, and BREEAM compliance reports pre-installation to support your evidential requirements. Please get in touch for advice on your lift, escalator or moving walkway selection, and we will be happy to advise further. 

Stannah Lifts Downloads Area

Relevant other BREEAM criteria

Under requirements elsewhere for HEA02 – Indoor air quality, MAT02-05 – Materials, WST01- Construction site waste management and MAN04 – Commissioning and handover, Stannah can work with you and supply supporting information on these requirements. 

What if my building has no qualifying lifts, escalators or moving walks?

Ene 06 Energy efficient transportation systems will not be assessed where a building contains no lifts, escalators or moving walks. Lifts with speeds of 0.15m/s or less fall outside the scope of ISO 25745 and can, therefore, be excluded from this issue’s assessment. This applies, for example, to lifts in single dwellings or those installed in other low-rise buildings, specifically for the use of persons with impaired mobility.

What about extensions?

If assessing a new extension to an existing building, lifts in the existing building fall outside the Ene 06 scope and do not need to be assessed. The above applies only where the lifts are not being renewed.

Are there other regulations regarding vertical transportation I need to be aware of?

There’s a whole host of standards when it comes to lifts. If you’d like to understand a little more, then Building regulations: key guidance for liftsLift standards glossary and escalator and moving walkways standards glossary are good places to start. But don’t worry! A knowledgeable lift company is capable of guiding you through the relevant standards as part of your lift specification.

Leave a Reply

Latest news

ASSA ABLOY

ASSA ABLOY EMEIA: Save valuable time and money with a seamless switch to programmable digital keys

In 2025, access management can be a whole lot easier. By making access part of their digital processes, businesses can put time-consuming key management and the cost of changing the locks firmly behind them. Making this switch is a lot easier than many people think, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, Health & Safety, Information Technology, Innovations & New Products, Retrofit & Renovation, Security and Fire Protection

Showersave
GEZE
Insight Data

Insight Data achieves ISO9001 recertification with zero non-conformities

Leading industry data specialist, Insight Data, has successfully achieved the prestigious recertification for ISO9001 with zero non-conformities for the fourth consecutive year.

Posted in Articles, Building Industry News, Building Regulations & Accreditations, Building Services, Information Technology, Research & Materials Testing