Steel-framed modular building system offers fast installation

  • 9 Jan 2014

Incorporated around a durable galvanised steel frame, the Rapidplan 3000 system can be adapted to any specification and stacked to form two or three storey buildings.  

Wernick Buildings
Nidum Works
Neath Abbey
Neath
SA10 7DS
UK

0800 18 18 22 (UK only)

Visit Wernick Buildings website

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows