Steel-framed modular building system offers fast installation

  • 9 Jan 2014

Incorporated around a durable galvanised steel frame, the Rapidplan 3000 system can be adapted to any specification and stacked to form two or three storey buildings.  

Wernick Buildings
Nidum Works
Neath Abbey
Neath
SA10 7DS
UK

0800 18 18 22 (UK only)

Visit Wernick Buildings website

Leave a Reply

Latest news

Passivent
Troldtekt

Troldtekt: New acoustic liner ensures good acoustics and easy handling

Both a building’s users and its developers have a good reason to get excited about the new Troldtekt Plus 25 panels. This specially developed acoustic panel sets a high standard for both sound absorption and building efficiency.

Posted in Acoustics, Noise & Vibration Control, Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Ceilings, Facility Management & Building Services, Floors, Innovations & New Products, Insulation, Interior Design & Construction, Interiors, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products, Walls

InstallerSHOW
Abloy