Steelwork galvanized for football stadium

  • 22 Jan 2015

Merseyside Galvanizing has used its hot dip treatment to galvanize steelwork for Everton FC’s new floodlights

The steelwork has been used to create a walkway to access, install and maintain the new floodlighting at Goodison Park, Everton Football Club’s stadium.

The new floodlights are required for the stadium to meet FA criteria, as the park can accommodate over 40,000 Everton fans and supporters.

At the request of Shawton Engineering, Merseyside Galvanizing provided its hot dip galvanizing treatment to around 50 tonnes of steel to ensure that the walkway is protected against all weather conditions.

The steelwork has been galvanized so that it requires as little maintenance as possible.

Wedge Group Galvanizing,
Stafford Street,
Willenhall,
West Midlands,
UK,
WV13 1RZ

Phone: 01902 630311
Fax: 01902 366353
Email: info@wedge-galv.co.uk

Leave a Reply

Latest news

Renderplas: Builders avoid costly remedial work with PVCu render beads

A pioneer of PVCu render beads, Renderplas is helping the construction industry avoid the costly remedial work associated with rusting steel designs…

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Facades, Posts, Render, Restoration & Refurbishment, Retrofit & Renovation, Sustainability & Energy Efficiency, Walls

How Celotex’s Technical Team adds value through expert insulation support

From U-value calculations to real-world installation support, Celotex’s technical team helps construction professionals specify and install insulation with confidence…

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Insulation, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Sustainability & Energy Efficiency, Walls