Sustainable Drainage System legislation faces further postponements

  • 2 Jun 2014

Local authority Approving Bodies have been informed that work approving SuDS schemes on new developments will not be given the go ahead from October 2014, but instead plans for implementation of Schedule 3 of the Flood and Water Management Act will be announced in the summer.

Alex comments, “SuDS legislation is a vital element of measures to combat surface-water flooding. There is only a narrow “window” for implementation, but based on previous experience, further delays can not be ruled out.” 

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows