The Steel Window Association has developed a series of fact sheets – all are viewable and downloadable here. The following is a synopsis of the aftercare and maintenance fact sheet which has been complied by the industry’s experts.
Simple measures, such as having the metal frame surfaces washed at the same time as the glass is cleaned, and undertaking an annual inspection of working parts, gasket weather seals and joint sealants, will do much to ensure trouble-free performance. This fact sheet gives general guidance on taking care of steel framed windows and doors so that they will continue to give years of satisfactory service.
Where materials are to be procured for renovation or replacement, the recommendations of the manufacturer should always be sought for confirmation of suitability for the specific application.
Most modern steel window frames have a factory-applied stoved polyester colour coating which should be washed down periodically, at intervals of between three and 12 months, using a mild non-alkaline detergent in warm water, and then rinsed. The finish will then last between 10 and 20 years before a decorative re-coat becomes necessary.
The synthetic rubber weatherseals should also be included in periodic maintenance inspections; the most common cause of damage is site applied paint. If paint removal proves impossible, weatherseal replacement can be undertaken, preferably with materials supplied by the original manufacturer.
The edges of double glass units and single panes must be spaced from the metal frame glazing rebate with setting and location blocks. They must also be carefully separated from the glazing upstand with distance pieces, mastic tapes or pre-formed gaskets.
All windows produced by SWA members in hot rolled steel sections to BS.6510 are protected by the hot dip galvanizing process in accordance with BS EN ISO 1461.
To read the full fact sheet, click here.
For further information on the Steel Window Association, or if you’re interested in becoming a member, visit www.steel-window-association.
Abloy UK has supplied The Safety Letterbox Company Ltd with a bespoke Sentry CL811 Camlock for use in its Secure Information Boxes, assisting life safety and complying with new regulations and legislation for high rise buildings.
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Facility Management & Building Services, Health & Safety, Posts, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire ProtectionSituated at the northern edge of a newly developed retail park near Bristol, the Abbey Wood Travelodge was conceived as part of the company’s new Budget-Luxe line of hotels – it features CUPACLAD, from CUPA PIZARRAS.
Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Cladding, Concrete, Cement, Admixtures, Facades, Posts, Restoration & Refurbishment, Retrofit & Renovation, WallsOrigin’s latest investment is set to redefine industry standards as it launches its own in-house powder coating facility.
Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Doors, Glass, Glazing, Innovations & New Products, Paints, Coatings & Finishes, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, WindowsC-TEC’s revolutionary CAST-PRO integrated detection and alarm devices have been chosen for a highly-regarded care home in Wrexham.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Health & Safety, Information Technology, Innovations & New Products, Retrofit & Renovation, Security and Fire Protection