As the UK experiences torrential rain and storm-level events, contractors need to consider the long-term damage ‘invisible water’ can have on their flood-hit construction sites, say Aggreko.
Ryan Stanley, from Aggreko’s Temperature and Moisture Control Division, has looked at whether or not UK construction sites are prepared for what could be the coldest winter on record…
Inspection chambers are a must for underground drainage systems and AXEDO plastic inspection chambers are rapidly becoming so popular on construction sites.