The following article has been written by Wojciech Brozyna, Managing Director of Aluprof UK Limited.
“There are many ways of completing various projects we undertake in both our personal and business lives. So, what are the ‘drivers’ to complete the work required?
How do we view the timeline to completion, what resources do we use and what inconveniences do we experience if we have to do the work again?
Taking a step back and looking at these issues enables us to better understand the work we require and how to complete it.
The question is do we look for a ‘quick fix’ one that will possibly fail again at some point, or do we look at a ‘permanent fix’, something that we can complete and forget, or hopefully have pride in a job well done?
What about costs? I suppose it depends on our timing, availability of funds and potential inconvenience. Window and facade requirements easily fall within these basic parameters and mind sets.
Let’s look at an example, a vertical ribbon glazing requirement over several floors, do we use curtain wall, or do we consider a stacked window system?
The curtain wall, correctly specified and installed, could be seen as a ‘permanent fix’, whilst a vertical run of jointed windows could be seen as a ‘quick fix’ and certainly cheaper.
So, do we prioritise the ‘sell’ and offer the cheapest solution, or do we ‘specify’ offering the client the robust and probably correct solution for a long and trouble free installation? Maybe both approaches could be correct, but we need to determine the clients requirements.
When a commercial aluminium systems company or installer quotes for a project, they are seen as the ‘specialist’. No one on site will generally question the specification, as long as it is broadly in line with the architects design intent unless the main contractor has employed their own facade consultant, or has a full time facade manager involved.
In the absence of this further specialist do we ‘sell’ or ‘specify’? Often to gain an order, some installers will offer the most cost effective solution based on installation costs, but, by looking at the project as a whole and not the system being costed in isolation, a more robust system can be used at a similar cost if the installation was ‘Value Managed’.
Value Management looks at every process from order through to completion. In the facade industry the principles of Value Management have been adopted by Aluprof to deliver competitive installations in conjunction with their extensive network of fabricators and installers.
To begin with, an overview of the complete project programme is needed, with each of the processes and deadlines for completion itemised. It is at this stage that options are discussed.
One of the obvious choices is that of the system to be used for the facade, as with other high end systems companies, Aluprof offer their systems in various designs to meet the exact needs of the building.
An example of this can be seen in Aluprof’s popular MB-SR50N Curtain Wall system, far from being a single system there are many options to choose from, these include various insulation levels, capping options or structural arrangements, each choice represents a cost or a cost saving.
It’s a little like specifying options on a new car taking the base model of choice as a starting point. A further consideration is the optimisation of aluminium profile cutting.
To reduce wastage on fabrication, profiles can be extruded to special lengths which offer high levels of cutting optimisation which in turn reduces material waste, which reduces costs.
These are just some of the important issues that are reviewed in the Value Management process which ensures that the completed project performs exactly as specified and perfectly meets with the clients expectations.
Utilising BIM to its fullest extent will always ensure that complications are discussed and cleared at very early stages, this again saves cost further down the supply chain.
Utilising BIM reduces the quantity of detailed installation drawings that need to be completed which compliment the BIM model.
Aluprof offer a wide range of BIM models which are constantly being revised to offer as much data as can be easily incorporated into a current BIM project.
With a large systems company such as Aluprof, working on the Value Management of a project at the very early stages, options such as choice of fabrication location can be explored to offer the best value and quality.
An example of this could be complex details within a unitised project where a local fabricator could produce all the standard units and where complex, say curved units, are manufactured competitively elsewhere where specialist equipment is available.
The key to any programme would be to add value, not in cost terms, but in quality and time performance. As we are all too aware, time delays on site carry significant costs for both main contractor and consequently sub-contractor.
To ensure that any installation meets exacting site requirements, new profiles can form part of the Value Management process. New profiles could offer not just a better detail, but new profiles can reduce costs and can reduce the time taken to install on site.
At the extreme end of Value Management is the option of developing an entirely new system to meet a projects requirement. The experience within the technical team at Aluprof makes this option entirely possible, as it has been done before.
Installation ‘Value Management’ could mean that on site teams are chosen with installers who are fully experienced in the exact systems being installed, possibly by making up new teams with highly experienced site agents who know the systems being used very well as they have worked on extensive installations using the same systems.
These are just a few of the considerations reviewed when Aluprof are specified in any facade or window project from the early design stages. The results speak for themselves, with Aluprof’s extensive growth in the UK working for some of the largest commercial contractors.”
Aluprof UK
Unit A5
Altrincham Business Park
Stuart Road
Altrincham
Cheshiire
WA14 5GJ
UK
(0044) 161 941 4005
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows