UZIN system helps to create a stunning new wedding venue

  • 20 Aug 2019

UZIN recently provided a system for Sissons Barn, a prestigious new wedding venue near Peterborough, to minimise risk and create flat, smooth flooring.

Sissons Barn is a purpose-built oak framed wedding venue designed to look like an old forge barn.

A new floor was required across all areas of the barn which contains a stunning open plan room for seating and dance floor as well as a bar, comfy lounge and back of house areas. The entire front section of the large barn was made of oak and glass, so the floor needed a ripple-free finish.

The flooring contractor, Superior Finish Contracts Ltd turned to UZIN because minimising risk was essential on such a prestigious project which needed an excellent finish to match the striking surroundings.

The UZIN system enabled a flat, smooth surface to be created which would cope with the future heavy footfall. UZIN PE 360 PLUS primer was applied over the screed followed by UZIN NC 163 a very low-stress smoothing compound which produces an outstanding flat and smooth surface. UZIN U 2100 and UZIN KE 2000 S pressure-sensitive adhesive was then used to install the floors.

Overall, the flooring helped to create a stunning wedding venue with durable and smooth, flat flooring. 

UZIN
Unit 2, Mitchell Court,
Rugby,
CV23 0UY
Telephone: 01788 530080
Fax: 01788 536508
E-mail: [email protected]

Visit UZIN's website

Leave a Reply

Latest news

Reynaers

Reynaers broadens Vision 7 functionality with new panic hardware

Reynaers Aluminium has added new panic hardware options to its Vision 7 Thermal Commercial Door – introducing both surface mounted and concealed systems for ease of opening in the event of an emergency.

Posted in Access Control & Door Entry Systems, Aluminium Products, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Doors, Facility Management & Building Services, Health & Safety, Innovations & New Products, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection

Geberit
ASSA ABLOY
Mitsubishi Electric

Filton and Bradley Stoke MP visits Mitsubishi Electric installation

Claire Hazelgrove, Member of Parliament for the Filton and Bradley Stoke constituency, visited Brabazon on 7 November to see firsthand the installation of innovative Ecodan heat pumps by Mitsubishi Electric.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, news, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency