Washroom Washroom refurbishes Wexham Park hospital

  • 27 Sep 2017

Washroom Washroom has recently completed the first phase of a large hospital refurbishment project.

A multi-phased refurbishment programme is currently taking place at Wexham Park Hospital’s maternity department.

Washroom was specified to design, manufacture and install high pressure laminate IPS units and duct panelling to the bedrooms plus solid grade laminate duct panelling in all the en-suite facilities and public toilets. 

Washroom’s Concerto integrated duct panelling system has been designed to be easy to clean, provide easy access for any future maintenance and conceal any plumbing and electrical services and therefore reduce the chance of tampering.

Washroom designed and installed the new wardrobe units in the private suites, in addition to creating a bespoke laminated reception desk.

Contact:

Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU

Phone: 0800 999 8888

Email: [email protected]

Visit the Washroom Washroom website

Leave a Reply

Latest news

BMBI
GEZE
Encon
SWA

SWA: A focus on Steel Window Association member West Leigh

Located in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows