Waterproofing membrane allows for a speedy installation at warehouse

  • 10 Jun 2014

The large scale work was completed in six weeks, four weeks under the set timeframe, due to the ease of installation through using the membrane.

Sika Sarnafil,
Watchmead,
Welwyn Garden City,
Hertfordshire,
AL7 1BQ,
United Kingdom

Phone: 01707 394444
Fax: 01707 329129

Visit Sika Sarnafil's website

Leave a Reply

Latest news

Passivent
Troldtekt

Troldtekt: New acoustic liner ensures good acoustics and easy handling

Both a building’s users and its developers have a good reason to get excited about the new Troldtekt Plus 25 panels. This specially developed acoustic panel sets a high standard for both sound absorption and building efficiency.

Posted in Acoustics, Noise & Vibration Control, Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Ceilings, Facility Management & Building Services, Floors, Innovations & New Products, Insulation, Interior Design & Construction, Interiors, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products, Walls

InstallerSHOW
Abloy