Contour offers four different thermostatic radiator valve (TRV) kits specifically designed for its LST radiators, available for both two-pipe and one-pipe systems. Here’s what’s included in the kits…
This TRV system is suitable for areas where access to the valve is not of a high priority and can be adjusted once a year.
The standard internal TRV kit must only be used in Bottom Bottom Opposite End (BBOE) connections to avoid the thermostatic head from getting false temperature readings. Comprising:
– 1 no. 9200-30 Design Sensor
– 1 no. 7724-91 TS-90 Angle Body 1/2”
– 1 no. 3724-41 Return Valve Angle 1/2”
– 2 no. 6292-01 15mm Nut & Olive
This is suitable for spaces where it doesn’t need regular adjustments. However, the radiator is connected TBOE, meaning the thermostat will be located at the top of casings.
This means that you would locate the remote sensor at the bottom inlet grill. Suited to TBOE connections, you will be able to read the correct temperature. Comprising:
– 1 no. 9430-08 Remote Sensing Phial 2m
– 1 no. 7724-91 TS-90 Angle Body 1/2”
– 1 no. 3724-41 Return Valve Angle 1/2”
– 2 no. 6292-01 15mm Nut & Olive
This kit allows service users to adjust the temperature of the room themselves as the remotes and thermostat is placed outside of the casing. Comprising:
– 1 no. 9230-06 Design Sensor
– 1 no. 7724-11 TS-E Angle Body 1/2”
– 1 no. 7350-60 Capillary & Fixing Adaptor
– 1 no. 3724-01 RL-1E Return Valve 1/2”
Suited for mental health environments, the CNC back to wall shrouds makes in difficult for service users to attach any ligatures to it, causing self-harm. Comprising:
– 1 no. Conical Aluminium Anti-Ligature TRV Shroud
– 1 no. 9200-03 Mini Turbo Sensor
– 1 no. 7724-91 TS-90 Angle Body 1/2”
– 1 no. 7350-60 Capillary & Fixing Adaptor
– 1 no. 3724-41 Return Valve Angle 1/2”
– 2 no. 6292-01 15mm Nut & Olive
If you would like to learn more about Contour’s TRV kits, click here.
Contour can be contacted at;
The Mansions
43 Broadway
Shifnal
TF11 8BB
Tel: 01952 290 498
Email: [email protected]
The latest Builders Merchant Building Index (BMBI) report shows builders’ merchants’ value sales in October were up +1.2% compared to the same month last year.
Posted in Articles, Bathrooms & Toilets, Bricks & Blocks, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Drainage, Drainage Services, Floors, Garden, Hand Tools, Hard Landscaping & Walkways, Health & Safety, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Interior Design & Construction, Interiors, Landscaping, news, Paints, Paints, Coatings & Finishes, Pipes, Pipes & Fittings, Plant, Equipment and Hire, Plumbing, Power Tools, Publications, Research & Materials Testing, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Timber Buildings and Timber Products, Walls, Waste Management & RecyclingKids’ Village is delighted to have partnered with GEZE UK as their 2025 charity of the year – find out more via the article…
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Doors, Facility Management & Building Services, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection, WindowsThe Encon Group, the leading independent distributor of building materials, is pleased to announce that it has been awarded Silver membership of The 5% Club by the 2024/25 Employer Audit Scheme.
Posted in Articles, Awards, Bricks & Blocks, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Civil Engineering, Cladding, Concrete, Cement, Admixtures, Facades, Hard Landscaping & Walkways, Health & Safety, Insulation, Landscaping, Plant, Equipment and Hire, Recruitment, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Training, WallsLocated in Charlton, South London, SWA member West Leigh was established during the Blitz, in 1943. During the destruction in London, the company helped in repairing windows and facades that had been damaged by bombings throughout the city.
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, Windows