CMS Group

Three ‘zero landfill’ years in a row for CMS Group

  • 4 Sep 2020

The CMS Group has reported another 12 months in which none of its production or post-consumer waste was sent to landfill, making it three ‘zero landfill’ years in a row.

In its last financial year (2019 – 2020), the leading facades, window and door designer, manufacturer and installer handled 2,802 tonnes of waste, generated mainly from post-use windows and doors that its installers remove during replacement contracts but also including waste from its office and factory operations – all of which is strictly recycled as standard.

Of this waste, 3.1% was reused, 96.5% was sent to be recycled and where possible remade into new products, including new glass double glazed units, and the remaining 0.4% was used by waste-to-energy specialists.

This latest ‘zero landfill’ achievement by CMS maintains its position at the forefront of sustainability in the facades, window and door market, and reflects the long-term success of its business strategy.

Since its inception in 2006, the company has operated its own full scale in-house waste processing facilities to collect and separate all waste resulting from its manufacturing, installation and office functions.

Any post-use windows and doors extracted from properties during replacement contracts are collected on site and taken to CMS’s Castlecary site to be separated into their constituent parts – mainly PVCu, timber, aluminium, glass and steel – which is then sent to specialist recyclers.

The team also identify products that can be re-used to ensure they completely avoid entering a waste stream, and the tiny proportion of materials that cannot be re-used or recycled are sent to waste-to-energy specialists.

In line with its ‘closed-loop’ ethos, CMS also continues to ensure its aluminium profile, PVCu systems and glass contain a high degree of recycled material for the manufacture of new facades, windows and doors.

For example, through its long term partnership with Saint-Gobain Glass, double glazed units installed by CMS contain 38% of post-use recycled glass – an industry leading level.

David Ritchie, CMS Group CEO, commented: “Hitting our zero landfill target for a third year in a row is a tremendous achievement and reflects the dedication and effort of the whole team in maintaining the highest levels of sustainable manufacturing and installation.

“Waste reduction and elimination is only going to become more important right across the construction and housing sectors as we work towards the zero carbon target dates set by Scottish and UK governments, so it is pleasing that we are already providing a successful model for the fenestration industry.”

Waste reduction is a core part of the United Nations’ 2030 Agenda for Sustainable Development, which the CMS Group’s business strategy is closely aligned with.

This ‘shared blueprint for peace and prosperity for people and the planet, now and into the future is underpinned by 17 Sustainable Development Goals (SDGs), including ‘Quality Education’, ‘Decent Work & Economic Growth’ and ‘Responsible Production & Consumption’.

Leave a Reply

Latest news

Altro

Altro distils style and performance at English Spirit

English Spirit Distillery has used an extensive package of Altro products front and back of house, in their new visitor centre café, shop and viewing area for the working distillery.

Posted in Articles, Bathrooms, Bedrooms & Washrooms, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Floors, Interior Design & Construction, Interiors, Kitchens, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products, Walls

Abloy

Abloy UK creates bespoke locking solution for Secure Information Boxes

Abloy UK has supplied The Safety Letterbox Company Ltd with a bespoke Sentry CL811 Camlock for use in its Secure Information Boxes, assisting life safety and complying with new regulations and legislation for high rise buildings.

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Facility Management & Building Services, Health & Safety, Posts, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire Protection

CUPA

CUPA: CUPACLAD enhances hotel aesthetics with a creative natural slate façade

Situated at the northern edge of a newly developed retail park near Bristol, the Abbey Wood Travelodge was conceived as part of the company’s new Budget-Luxe line of hotels – it features CUPACLAD, from CUPA PIZARRAS.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Cladding, Concrete, Cement, Admixtures, Facades, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls

Origin