BIM

Openings Studio online platform to be debuted at BIM Level 3 event

  • 14 Jun 2016

ASSA ABLOY UK Specification will be debuting its Openings Studio platform at the ‘BIM Level 3 and beyond – Moving Forward After Level 2’ event this June.

‘BIM Level 3 and beyond’ will look at the step up to the next level of BIM and the challenges that the journey will face. 

Delegates will be amongst the first to see the company’s Openings Studio platform, which is due to be launched later this year. The online door and ironmongery scheduling platform has been described by ASSA ABLOY as “a vital part of any BIM toolkit in achieving BIM Level 3 ambitions.”

The platform has been created to take the burden out of scheduling doorsets by using a familiar format that architects can work with. The online tool uses shared information from a BIM model to analyse and interpret the data for door and ironmongery scheduling. Once the user is satisfied with the information provided by ASSA ABLOY’s scheduling team, the data is then imported back into the model.

Andy Stolworthy, BIM Manager for ASSA ABLOY UK Specification, will also appear the event to discuss ASSA ABLOY’s approach to BIM as a manufacturer and its adoption within the industry and future role.

Discussing the upcoming event, Andy commented: “The focus of BIM has, for many, been around meeting the government deadline and ensuring adoption in the design and build phase of a project. But the journey toward BIM Level 3 will raise more challenging questions, questions that must be addressed to meet with industry targets. 

‘BIM Level 3 and Beyond’ will provide a great forum for debating some of these concerns and obstacles that we, as an industry, face in the delivery of BIM L3. As an early adopter of BIM, we look forward to discussing the future role it will play with like-minded professionals.”

ASSA ABLOY UK Specification can be found on stand 12 at ‘BIM Level 3 and beyond – Moving Forward After Level 2’, which will be held at the Renold Building, University of Manchester on 29th June.

ASSA ABLOY,
School Street,
Willenhall,
West Midlands,
WV13 3PW
United Kingdom

Tel: +44 (0)845 071 0882

Visit ASSA ABLOY's website

Leave a Reply

Latest news

Abloy UK security systems ensure resilience when faced with power outages

Following reports of power outages at a UK airport, Abloy UK is flagging-up the need for effective access control solutions that maintain security even when the power supply is disrupted

Posted in Access Control & Door Entry Systems, Articles, Posts, Security and Fire Protection

Sentinel Apex from Vent-Axia specified to provide ventilation at ECO MEP's highly-efficient office

Vent-Axia has supplied its CIBSE award winning Sentinel Apex for the ventilation of ECO MEP’s highly-efficient commercial office environment in Ashford, Kent

Posted in Air Conditioning, Articles, Heating, Ventilation and Air Conditioning - HVAC, Posts

Strand Hardware emphasises the importance of door and window safety

Architectural ironmongery and security products supplier, Strand Hardware, highlights the pivotal role that safety plays in the built environment

Posted in Architectural Ironmongery, Articles, Doors, Health & Safety, Posts, Windows

Senior Architectural Systems introduces new, low carbon aluminium extrusion offering – ReAL 2.0

Senior Architectural Systems is going the extra mile to reduce the carbon footprint generated through the transportation of its products by supporting the use of UK-sourced closed-loop recycled aluminium

Posted in Aluminium Products, Articles, Doors, Posts, Windows