RetrofitThe April 2026 report from UK Green Building Council (UKGBC) highlighted that most buildings are set to remain in use until at least 2050. Retrofit, not replacement, is therefore critical to achieving the UK’s net zero targets. Yet while attention is often focused on upgrading façades, building services and energy performance, the ground beneath existing buildings can remain overlooked until problems emerge. Here, Jon Chevin, commercial and infrastructure director at geotechnical specialist Geobear, explains why ground stability should be considered from the outset if retrofit is to keep buildings fit for purpose for decades to come.

As existing buildings are adapted for new uses, heavier equipment and more ambitious upgrades, the demands placed on them can change significantly. Understanding the condition of the whole asset, including the ground supporting it, is therefore essential.

Retrofit changes more than the building

Retrofitting is changing what existing buildings are expected to do. Warehouses are being upgraded for heavier automation systems, offices repurposed for changing workplace needs and industrial facilities installing larger equipment.

Developers are also extending buildings, adding mezzanine floors and introducing rooftop solar or green infrastructure to maximise existing assets.

While these interventions are carefully engineered above ground, they can place additional demands on foundations designed for different requirements. The question is whether both the structure and the supporting ground can accommodate these changes.

Climate resilience extends below ground

Climate resilience has become an established consideration in building design, with attention focused on overheating, flooding and extreme weather. Yet ground stability can receive considerably less attention.

The British Geological Survey (BGS) estimates that shrink–swell ground movement has cost the UK economy around £3 billion over the past decade, making it one of the most damaging geohazards.

With half of England declared in drought in July 2026, prolonged dry conditions present an additional consideration. For buildings founded on shrink-swell clay, particularly across southern England, changes in soil moisture can cause the ground to contract, increasing the potential for movement beneath foundations.

The consequences extend beyond repair costs. Ground movement can disrupt operations, delay refurbishment programmes and undermine investment elsewhere in a building. If retrofit is intended to improve resilience, the ground on which buildings depend cannot be an afterthought.

From reactive repairs to proactive asset management

Ground investigations have traditionally been prompted by visible defects. Cracking masonry, uneven floors or sticking doors can trigger surveys once movement is already affecting a building. By then, the issue has become a reactive maintenance problem.

As retrofit projects become more complex, developers need to consider ground conditions alongside structural integrity, building services and energy performance. Where proposed changes could affect loading or there are signs of movement, understanding the supporting ground should form part of the initial assessment.

This does not mean every existing building requires ground remediation. The priority is identifying potential issues early enough for project teams to understand the implications and make informed decisions.

Where intervention is necessary, modern ground engineering techniques can offer alternatives to traditional excavation and underpinning. Less invasive approaches can improve ground conditions with limited excavation, reducing disruption to occupied buildings and helping maintain operational access.

Making ground conditions part of the retrofit strategy

A proactive approach does not necessarily require extensive ground investigation for every refurbishment. Instead, project teams should consider whether proposed changes could alter the demands on existing foundations or whether ground conditions may have changed since construction.

Changes of use, additional loading, extensions and new rooftop infrastructure can all justify revisiting the relationship between a building and the ground beneath it. Existing cracking or uneven floors may also indicate movement that needs investigating before further investment.

Identifying potential issues early gives engineers more opportunity to assess available options and incorporate necessary work into the refurbishment programme.

It also changes how ground remediation is viewed. Rather than an unexpected cost arising after defects develop, addressing ground conditions early can form part of a wider strategy to protect an asset’s value. Coordinating this work with planned structural, energy or building services upgrades can help manage disruption and make better use of project budgets.

The next generation of retrofit projects must consider more than what can be upgraded, replaced or added above ground. If existing buildings are expected to deliver value for decades to come, their future performance needs to be considered from the ground up.